Expert Advice on Green Buildings

LEED Indoor Environmental Quality Practice Test Questions

Test your knowledge of the LEED Indoor Environmental Quality credit, with our free practice test questions. Every day a new practice problem for your LEED exam!

Indoor Carpet Adhesives: Comply with which Reference Standards?

While using indoor carpet adhesives, a LEED NC project has to comply with which of the following reference standards?

>>Take the Practice Question Now!
 

Which of the following standards are to be referenced for EQ credit 3: Construction IAQ management plan?

Which of the following standards are to be referenced for EQ credit 3: Construction IAQ management plan?

>>Take the Practice Question Now!
 

LEED NC Building with 6 Conference Rooms Pursuing EQ Credit: Which Strategies are Necessary?

A LEED NC building project with 6 conference rooms each of 240 Sq.ft planned for 8 people is pursuing EQ credit 1: Outdoor air delivery monitoring. Which of the following strategies are necessary to comply with the credit requirements?

>>Take the Practice Question Now!
 

Achieving EQ Credit 2: Increased Ventilation?

A LEED NC office building has chosen natural ventilation via operable windows. In order to achieve EQ credit 2: Increased ventilation, which one of the following strategies is not applicable?

>>Take the Practice Question Now!
 

Strategies for Outdoor Air Delivery Monitoring to Satisfy EQ1?

Which of the following are the methods/ strategies to directly determine outdoor air intake and ventilation rates to satisfy EQ credit 1: Outdoor air delivery monitoring?

>>Take the Practice Question Now!
 

Monitoring Outdoor Air Delivery: How to Configure Alarm and Provide Air Flow Measurement Device?

While monitoring outdoor air delivery for LEED NC purpose: an alarm has to be configured when the conditions from the set point vary by what percent? A direct outdoor air flow measurement device has to be provided capable of measuring minimum outdoor airflow rate with an accuracy rate of what percent?

>>Take the Practice Question Now!
 

LEED Gold Certification Non-Smoking Policy: What other actions are necessary to ensure compliance with ETS Control?

An office building project aiming at Gold certification with the LEED NC rating system has a non smoking policy which would prohibit smoking inside the building. What other actions are necessary to ensure compliance with the EQ pre requisite: ETS control?

>>Take the Practice Question Now!
 

Naturally ventilated museum building aiming at certification with the LEED NC rating system?

A naturally ventilated museum building is aiming at certification with LEED NC rating system. Which of the following is applicable in terms of location and size of ventilation?

>>Take the Practice Question Now!
 

Low Rise Residential Project Aiming at LEED NC Gold: Which of the following is true?

A low rise residential project aiming at LEED NC – Gold certification may not use ASHRAE standard 62.1.2004 to comply with the EQ: pre requisite 1 Minimum IAQ performance. Which of the following is true about the project’s certification as a LEED NC Gold rated building?

>>Take the Practice Question Now!
 

At what stage is the project eligible to earn EQ credit 3: Construction IAQ management plan?

A core and shell project is certifying under LEED NC rating system. At what stage is the project eligible to earn EQ credit 3: Construction IAQ management plan?

>>Take the Practice Question Now!
 
Syndicate content