Centek LEED Indoor Air Quality Testing

The Centek Labs’ Sustainable Air-Sampling Program uses less (yet more innovative) media and equipment.

Media set up and break down requires no tools or power. Media setup time is one-third the estimated setup time of other sampling programs.

Complies with LEED® 2009 for New Construction and Major Renovations IEQ Credit 3.2: Construction Indoor Air Quality Plan—Before Occupancy OPTION 2. Air Testing

LEED® Air-Sampling and Analytical Program

Upon researching air-sampling programs available from other laboratories, the Centek Labs team of analysts and LEED® accredited professionals aimed to utilize its unique capabilities to provide a program that is simple, cost effective, and environmentally friendly.

After thorough research the Centek Labs team developed an air-sampling program using our specially treated whole air-sampling canisters and instrumentation while adhering to all requirements set for the by LEED® 2009 for New Construction and Major Renovations IEQ Credit 3.2: Construction Indoor Air Quality Plan—Before Occupancy OPTION 2. Air Testing.

Cost Effective Sustainable Air Sampling Program

SAVINGS are made possible through our ALL IN ONE PRICING schedule. TIME IS MONEY, because of its simplicity, you will spend less time in the field.

Our standard analytical turn around time is 5 business days. We offer rush turn around times as soon as same day. The faster the building owner can occupy, the more money they can make.

 

Related Posts
Aiman asks: Hi, I read your other article about the new LEED v4 rating system
Question: Roxie asks: For a building that has achieved a LEED EB certification, are there any
Question: Catherine asks: Anyone know what the threshold is for exceeding MR2 (Construction Waste Management) to